Launching gantry in both span by span and cantilever at Hong Kong (Freyssinet) for erecting Tuen Mun - Chek Lap Kok link bridge.
•Erection in Cantilever 120m (394ft)
•Erection in spam by span 80m (262ft)
•Curveture 198m (650ft)
•Machine length 200m (656ft)
•Machine height 19.4m (63.6ft)
•Longitudinal slope 6.3%
•.Transversal slope 8.4%
•Lifting (one WT) 120tons
•Max. lifting 2225tons
Special Launching Carrier with Under-bridge for passing through tunnel to erect HSR viaduct in full span method.
Lifting Capacity in 1000 tons for erecting huge box beam in full span 24-35 m.